2013 Pathway Construction

​Current Status Complete​
​Timeline Winter 2013/2014 ​
​Location ​Various Location Throughout the City
 

About the Project

This project will construct 4 pathways at various locations throughout the City of Lethbridge.

Background

The City of Lethbridge completed the Bikes and Pathways Master Plan in March 2007, which was subsequently endorsed by City Council in the Summer of 2007. The Master Plan has proposed a bike and pathway classification and has identified a number of corridors for bikeways and pathways developed in the City of Lethbridge. These pathways are part of the implementation plan to the system.

Scope

The scope of the work includes design and tendering of the projects. ISL Engineering has been hired to complete this task. Construction will follow and is planned for May 2013 start.

Deliverables

Design Development and Construction of 4 pathway segments:

Popson Park Dog Run Pathway (Complete)

  • 2 metre wide limestone pathway
  • Provides all weather surface to walk on

Coachwood Point Pathway (Complete)

  • 1.5 metre wide limestone pathway
  • Connects Ridgewood to Heritage Subdivision along the coulee edge

Pathway #7 (Complete)

  • 1.5 metre wide crushed limestone pathway
  • Connects the west side of the river bottom between Whoop Up Drive and Eizabeth Hall Wetlands

Pathway #20 (Complete)

  • 2 metre wide crushed limestone pathway
  • Connects 32nd Avenue South to Tudor Estates along the coulee behind Lethbridge College

 

Funding

​Source ​Amount
Pay As You Go (PAYG)​ ​$2,600,000
​Total ​$2,600,000

 

Links

 

 

 

 

Contact Information

Dave Ellis, Parks Manager
david.ellis@lethbridge.ca
403 320 3848