Sign In

2014 Roadway Overlays

​Current Status ​Complete
​Timeline ​Summer 2014
​Location ​Various Locations

 

About the Project

Roadway overlays includes the milling and re-paving of various streets within the City of Lethbridge.
 
Milling is when a grinding machine goes down the total length and width of a street and grinds 60 to 80mm of asphalt off the top of the road surface. The material that is ground off is reused by putting it back into the asphalt mix that is put back onto the roadway. This reused material make up approximately 14 % content in the mix design.

2014 Arterial Roadway Overlay Schedule

​Location ​Status
1st Avenue South (west of Scenic Drive South) Complete
Scenic Drive South (between 1st and 5th Avenue South) ​Complete
Stafford Drive North (between 6th and 9th Avenue North) ​Complete
Whoop Up Drive West (between University Drive and Jerry Potts Blvd) ​Complete
 

 

2014 Collector Roadway Overlay Schedule

​Location ​Status
12B Street South (between 1st and 2nd Avenue South) ​Complete
2nd Avenue North (between 13th and 19th Street North) ​Complete
Columbia Blvd West (between Temple Blvd West and Pensacola Court West) ​Complete
 

 

2014 Local Roadway Overlays

​Location ​Status
5A Avenue North (between 21st and 23rd Street North) Complete
6th Avenue North (between 21st and 23rd Street North)  ​Complete
8A Avenue North (between 19th and 20th Street North) ​Complete
11th Street North (south of 9th Avenue North to the park) ​Complete
12th Street North (between 3rd and 4th Avenue North)​ ​Complete
19th Street North (between 4th and 5th Avenue North)​ ​Complete
19th Street North (between 5A and 6th Avenue North) ​Complete
20th Street North (between 2B and 4th Avenue North) ​Complete
20th Street North (between 9th and 10th Avenue North) ​Complete
21st Street North (between 5A and 6A Avenue North) ​Complete
8th Avenue South (between 15th and 18th Street South) ​Complete
17th Street South (between 8th and 9th Avenue South) ​Complete
 

 

Funding

Source​ ​Amount
​Grant - FGTF (Federal Gas Tax Fund) ​$1,043,000
Pay-As-You-Go Transportation ​$116,000
​Total ​$1,159,000
 

 

Links

 

  

Contact Information

Naftali Kiboya, Project Engineer and Designer - Transportation
City of Lethbridge
403 320 3117