Sign In

2015 Water, Wastewater & Stormwater Renewals (E13-27)

​Status ​Complete
​Timeline ​2015
​Location ​Various Locations Across the City
 

About the Projects

 
Like all infrastructure, pipelines eventually need to be replaced. As our water, sewer and storm lines reach the end of their design life, the likelihood of failure increases. We analyze all pipelines based on a variety of factors including but not limited to; failures, condition, risk, roadway quality, location, and customer feedback. The results of this examination optimize the annual renewal programs. The final step is to coordinate renewals in conjunction with roadway overlays to ensure we are not disturbing new asphalt.

If you have any comments or suggestions for existing or future renewals, please contact the Water & Wastewater Systems Manager, Adam Campbell at 403 320 4744.
 

Watermain Renewals

​Location
​Status
2nd Avenue South (west of Scenic Dr S)
​Complete
2 A Avenue North (between 26th St N & 28th St N)
​Complete
4th Avenue & 13th Street South (intersection)
Complete
​5 A Avenue North (between 13th St N & 18th St N) Complete
​9th Avenue South (between 20th St S & 21st St S) Complete
13th Street South (between 4th Ave S & 5th Ave S)
​Complete
23rd Street South (between 4th Ave S & 5th Ave S)
Complete
26th Street South (between 4th Ave S & 27th St S) Complete
 
 

Wastewater Renewals

​Location ​Status
7th Street South (between 5th Ave S & 6th Ave S)
​Complete
8th Avenue South (between 7th St S & 11th St S) ​Complete
8th Street South (between 7th Ave S & 8th Ave S)
​Complete
​20th Street North (between 1st Ave N & 6th Ave N) ​Complete
 
 

Stormwater Renewals

​Location ​Status
Storm Outfall Replacement (Botterill Bottom Park)
​Complete
 
 
 
 

Contact Information

Doug Kaupp, Manager - Water, Wastewater & Stormwater
City of Lethbridge
403 320 3078