Sign In

2016 Playground Renewals

​Current StatusComplete
​Timeline​2016
​Location​Various Playgrounds Across the City

 

Description of Project

This project will replace 3 existing city-wide playgrounds that are due for replacement. All 3 playgrounds are to be renovated by the end of 2016.
 

Background

The City of Lethbridge is undertaking a renovation and refurbishment program to repair and replace aging playgrounds and play equipment in several municipal parks throughout the city.
 
In 2016 this program will include the renovation of existing playgrounds and the installation of new play equipment in 3 existing playground sites. These sites include:

 

 


Scope

Preparation of conceptual layout designs of all play equipment including representations and descriptions of all equipment, proposed locations, fall zone requirements, no encroachment zones, play surface depths and requirements, materials, colours, special features and conditions.
 
Manufacture, supply, storage as necessary, and delivery to the individual playground sites of all materials, tools, fixtures, and equipment necessary for the complete installation of all playground elements.
 
Submission of letters of compliance certifying that all equipment complies with and has been installed to meet all applicable CSA and City of Lethbridge standards and
guidelines.
 
Warranty of all equipment and workmanship for a period of not less than 1 year.
 
All associated removals, and landscape work related to the supply, design and
installation of new playground equipment including but not limited to:

  • Irrigation repair
  • Tree planting and removal
  • Pathway Construction
  • Header and surface installation
  • Light standard installation
  • General landscape construction 

Links

 

 

Contact Information

Dave Ellis, Parks Manager
david.ellis@lethbridge.ca
403 320 3848