Metis Trail Walsh to Whoop Up

Construct the first two lanes of Metis Trail from Walsh Dr to Whoop Up Dr W.

2014: Detail design and construction of the first 2 lanes of the ultimate 4-lane arterial from Garry Drive to Jerry Potts Blvd. This project is being advanced to relieve congestion on Squamish Blvd. This section will accommodate increased traffic volumes in Indian Battle Heights area as well as provide a second access for the Garry Station subdivision.

2018: Detail design and construction of the first 2 lanes of the ultimate 4-lane arterial from Walsh Drive to Country Meadows took place in 2012 for the developer to gain access to Country Meadows. The agreement states that payment for the construction of this road will be made in 2018.

2020: Detail design and construction of the first 2 lanes of the ultimate 4-lane arterial from Caledonia to Whoop Up.

2024: Detailed design and construction of the first 2 lanes of the ultimate 4 lane arterial from Country Meadows entrance to Garry Drive and from Jerry Potts to Caledonia. This will complete construction of Metis Trail between Walsh Drive and Whoop Up.

Metis Trail will become a major north-south arterial roadway (similar to University Drive) and will provide the necessary access to the proposed developments west of Metis Trail as well as assisting with traffic calming in existing West Lethbridge neighbourhoods. The construction of this road will provide needed access for continued growth in the Crossings, Garry Station and Country Meadows neighbourhoods.