West Side Operations Depot Phase 2 (D-29)

​Current Status Scheduled
​Next Steps Phase 2 to commence in the Spring of 2017
​Location​West Lethbridge
 

About the Project

This project addresses future Public Operations and Corporate needs in West Lethbridge. This three phase project involves the construction of a West Lethbridge Public Operations facility. The ultimate site will require approximately 13h of land.

Phase 1 (Prior) - This first phase of the west side depot included the  construction of the snow dump site, snow dump settling pond, fuel depot, installation of a portable, temporary public operations depot and site access intersection improvements from University Drive. The area of development for this first phase required the acquisition and site grading of approximately 7.43h of land.

Phase 2 - This phase would include the construction of a sand/salt storage facility as well as the construction of an onsite stormwater management facility and related infrastructure. The sand/salt building will be sized at approximately 25m x 50m (82ft x 164ft). The total site area required for phase 2 will be approximately 3.37h of land.

Phase 3 - Phase 3 would involve the relocation of temporary offices and locker trailers and the construction of indoor and outdoor vehicle, equipment, and material storage for Public Operations. It is anticipated that this phase of development will require 2.95h of land.

Funding

Total Cost (2017/2018) Phase II ​$5,130,000