Urban Construction and Right-of-Way Coordination

URBAN CONSTRUCTION

Urban Construction administers the process of converting raw land into new serviced lots. Our function is to oversee the approval, inspection and transfer of new infrastructure to the City of Lethbridge.

 

Documents:

1. Urban Construction Documents

2. Offsite Levy Bylaw

3. Design Standards

4. Construction Specifications

 


 

Contacts:

Byron Buzunis
Urban Construction Manager
403 320 3975
byron.buzunis@lethbridge.ca

Eric Furgason
Urban Construction Coordinator
403 329 7316
eric.furgason@lethbridge.ca

Janet Gutsell
Urban Construction Coordinator
403 320 3091
janet.gutsell@lethbridge.ca

 

 RIGHT OF WAY COORDINATION

Right of Way Coordination grants approvals and issues permits for deep and shallow utility installations within the City of Lethbridge.

 

Right of Way Permits :

Utility Location Assignments (ULA)
Utility Location Assignment Permits are required prior to the installation of any new infrastructure within the road Right of Way (ROW), within any City owned easement (Utility Right of Way; URW) or within any City owned parcel labeled as a Public Utility Lot (PUL)

Utility Location Assignment Permit Guidelines & Permit Process - coming soon! 


Excavation Permits

Excavation Permits are required prior to construction taking place within the road Right of Way (ROW), within any City owned easement (Utility Right of Way; URW) or within any City owned parcel labeled as a Public Utility Lot (PUL) when the depth of the excavation is 30 centimeters (12 inches) or greater below the established elevation.

(Excavation Guidelines & Permit Application Requirements – coming soon!)


Hoarding Permits

Hoarding Permits are required for the temporary use of the road Right of Way (ROW) for something other than its intended purpose, when work cannot take place solely on private property in order for the work to be completed safely and efficiently.

(Hoarding Guidelines & Permit Application Requirements – coming soon!)


Documents and Links:

    1. Section 06000 - Backfilling Regulations for Public RIght-of-Ways
    2. City of Lethbridge Temporary Traffic Control (TTC) Manual.
    3. Standard Drawing 33.pdf
    4. Standard Drawing 34.pdf
    5. Standard Drawing 35.pdf
    6. Standard Drawing 36.pdf
    7. Construction Specifications - Seeding
    8. Asphalt Concrete Specifications - Section 05140
    9. Excavation Permit Guidelines & Permit Process - coming soon!
    10. Excavation Permit Application - coming soon!

 


Right of Way Contact:

Beverly-Ann Parker
Right of Way Coordinator
403 320 3150
beverly.parker@lethbridge.ca

 

For any questions relating to Right of Way Permits, please email: rowapplications@lethbridge.ca 

 

 

 

 

The City welcomes comments and suggestions about improving our documents.  Please email urbanconstruction@lethbridge.ca with any comments you have.  The Documents are reviewed on an annual basis.  If you have something urgent or would like to discuss your comments please contact Urban Construction staff directly.