Sign In

News Centre

Category Image

Lane Reductions Whoop Up Drive

​Road maintenance is planned for eastbound Whoop Up Drive for the application of durable pavement markings, with moving lane reductions throughout the day beginning at 7 a.m. on Sunday, June 12.

Speed will be reduced to 60 km/hour for the duration of this work which is expected to be completed by the end of the day, weather permitting.

Durable pavement markings are made of thermoplastic paint which is inlaid into the asphalt lasting much longer than standard traffic paint. The material is heated and molten when applied and when it's cooled becomes a hard, durable material. The durable pavement marking contract is part of the annual asphalt rehabilitation program.

Motorists are advised to drive with caution in this area and follow posted signage.

For Public Inquiries:

Call 311 |  Monday to Friday, 8 a.m. to 4:30 p.m.