2018 Watermain Renewals

​Current StatusActive
Timeline2018
LocationVarious​ locations

About the Program

Like all infrastructure, pipelines eventually need to be replaced. As our water, sewer and storm lines reach the end of their design life, the likelihood of failure increases. We analyze all pipelines based on a variety of factors including but not limited to; failures, condition, risk, roadway quality, location, and customer feedback. The results of this examination optimize the annual renewal programs. The final step is to coordinate renewals in conjunction with roadway overlays to ensure we are not disturbing new asphalt.

 

Scheduled Renewals

Location​Status

24th Street South & 19th Avenue South  

​Complete

9th Avenue ‘A’ South (between 12th & 12th Street ‘B’ South)

Complete
South Parkside Drive (from 27th Street to 32nd Street South)Complete
​5 Avenue North (16 Street to 23 Street)​Complete
5 Avenue South (7th Street & 8th Street South)Complete
13 Avenue North (from 15th Street to 23rd Street North)Complete
 

To learn more about watermain breaks please click here.