Roadway Pathway Construction (C-6)

Current Status Active
Timeline 2015/2018
Location Various Locations Across the City
 
 

About the Project

This project will construct three roadside pathways at various locations throughout the City of Lethbridge.
 

Background

The City of Lethbridge completed the Bikes and Pathways Master Plan in March 2007, which was subsequently endorsed by City Council in the Summer of 2007. The Master Plan has proposed a bike and pathway classification and has identified a number of corridors for bikeways and pathways developed in the City of Lethbridge. These pathways are part of the implementation plan to the system and will complete missing links in the City’s pathway network.
 

Scope

The scope of the work includes design and tendering of the pathways. Amec Foster Wheeler has been hired to complete this task. Construction will follow and is planned for Spring 2015 start.
 

Deliverables

Detailed Design and Construction of three pathway segments:
 
Scenic Drive Pathway (Active)
 
  • Adjacent to Scenic Drive (west side of the road), from 1st Avenue South to 9th Avenue North
  • 3 metre wide asphalt multi-use pathway
  • Completes a missing link in the regional pathway system between north and south Lethbridge 
  • Includes a pedestrian crossing complete with flashing lights at the Scenic Drive off-ramp to 5th Avenue North
  • This project is scheduled to be complete in the spring of 2018. 
 
Mayor Magrath Drive Pathway (Complete)
  • Adjacent to Mayor Magrath Drive South (east side of the road), from 3rd Avenue South to Parkside Drive South (7th Avenue South) 
  • Includes a pedestrian crossing complete with flashing lights on the northbound Mayor Magrath Drive off-ramp to Highway 3 
  • 3 metre wide asphalt multi-use pathway 
  • Completes a missing link in the regional pathway system helping to connect north and south Lethbridge.
  • The Mayor Magrath Drive pathway is completed between 5th Ave. S and the Highway 3 ramp. The remainder of the work will be completed this spring.
 
Lafayette Boulevard West to University Drive Connector Pathway (Complete)
  • Connects the pathway that runs along Whoop-Up Drive / Lafayette Boulevard West to University Drive West (including a pedestrian crosswalk across University Drive at the traffic signals to the pathway on the east side of the road)
  • 3 metre wide asphalt multi-use pathway improves the connectivity of the west side pathway network 
  • This project is scheduled to begin in the spring with an estimated completion date of June 30, 2016.

Funding

Source Amount
Federal Gas Tax Fund $2,055,000
Total $2,055,000
 

Contact Information

Craig Richter, Senior Project Administrator - Infrastructure Services
403 320 3993
craig.richter@lethbridge.ca