College Drive roundabout construction complete

Beginning tomorrow, Tuesday, August 11, the intersection of College Drive South and 28 Avenue/Tudor Boulevard South will reopen as construction is complete on the new roundabout. 

All detours associated with the project will be removed. 

Lethbridge Transit service on Route 2 Blue and Route 62 will resume regular service in this area. Transit passengers can review their route on MyRide.

This project was part of the City’s 2026 Intersection Improvements Program, focused on improving safety and traffic flow at this location. Work included roadway reconstruction, upgraded street lighting, relocation of a bus stop and landscaping restoration.  

The new roundabout is designed to improve traffic flow while increasing safety by reducing speeds, minimizing conflict points and lowering the risk of severe collisions.  

Before using the new roundabout, drivers are encouraged to watch the City’s roundabout education video and remember SLOWERS when navigating the intersection:

  • Slow down 
  • Lane selection before entering 
  • Observe crosswalks 
  • Wait for circulating traffic 
  • Enter when safe 
  • Right signal to exit 
  • Scan for pedestrians again 

More information on the 2026 Intersection Improvement Program, along with the roundabout video, can be found on Get Involved Lethbridge.

For Public Inquiries:   

Call or chat 311 | Monday to Friday, 8 a.m. to 4:30 p.m.