Paving toward a new pathway
A fresh new route is coming to south Lethbridge!
Construction is moving forward on Pathway 17. The multi-use trail will run along 43 Street South and South Parkside Drive South. Designed to improve safety and connectivity, the completed path will link existing routes to form a continual loop, making it easier to walk, cycle and enjoy the outdoors.
This phase of construction begins on Monday, August 11, and includes traffic disruptions and detours.

- The intersection of 43 Street South and 20 Avenue South will be closed
- Drivers are encouraged to use Forestry Road South (follow the posted detour signs)
- Local traffic can access 20 Avenue South from the west at 40 Street South/Cedar Road South
The intersection should reopen on Saturday, August 16, weather permitting.
Motorists are asked to please slow down in the work area and follow all posted signage.
While the construction will cause temporary traffic disruptions, the long-term improvements will create a more vibrant and accessible community for everyone.
Find more information on Pathway 17 on the Get Involved Lethbridge website.
Explore details about the intersection construction on the Lethbridge WebMAP.
For Public Inquiries:
Call or chat 311 | Monday to Friday, 8 a.m. to 4:30 p.m.
Contact Us
City Hall
910 4 Avenue South
Lethbridge, AB T1J 0P6
Phone: 311
or 403-320-3111 (if outside of Lethbridge)